Integra Resources Confirms Growth Potential at Florida Canyon with Strong Drill Results, Expands Program to 16,000 Meters

ITRG
October 08, 2025

Integra Resources Corp. announced initial results from its 2025 resource growth drilling program at the Florida Canyon Mine on August 5, 2025. The success of initial drilling has led to an expansion of the program from approximately 10,000 meters to 16,000 meters of reverse circulation and sonic drilling.

The drilling confirmed significant near-surface oxide gold potential from historical low-grade waste material, with top intercepts from the North Dump including 0.36 g/t Au over 71.6m and 0.37 g/t Au over 47.2m. Drilling in Inter-Pit areas also showed promising results, such as 0.47 g/t Au over 39.6m in the North Pit and 0.27 g/t Au over 114.3m in the Central/Radio Tower Saddle.

These results confirm excellent grade continuity and underscore the potential to grow resources and extend mine life at Florida Canyon. The expanded program will focus on historical waste areas, with preliminary volume and grade estimation underway to support a mineral resource and reserve update and a revised life-of-mine plan in H1 2026.

The content on BeyondSPX is for informational purposes only and should not be construed as financial or investment advice. We are not financial advisors. Consult with a qualified professional before making any investment decisions. Any actions you take based on information from this site are solely at your own risk.